Ongoing Projects

Al RUWI AL TASNEEM LLC Manufacturing and Fabrication of "Stack up for Deep-Water 18 3/4"

Description:

Advanced Welding Machines

  • Welding Machines with Turntables
  • FCAW and MIG machines, GTAW (Manual & Semi auto)
  • Our welders are mostly 6G - SMAW qualified
  • Capable of welding AISI 4130, 4140, 8630, 410, SA309, 316, F 22, API X 80, Low carbon steels and Overlay welding with stainless steel, Inconel and Aluminum Bronze complying to ASME Section IX, AWS, API 6A, NACE MR00175, EN ISO:15614-1 or any material welded to the customer's needs
  • Furnaces for Post Weld Heat Treatment

Portable CMM Machines

  • Load testing facilities up to 750 tons
  • Portable CMM to the accuracy of 0.0005"
  • PT, Fluorescent MPI, Hardness Equipments
  • Cranes = 10# (up to 30 Tons)
Blowout Preventer1
Blowout Preventer 2
Blowout Preventer 3
Blowout Preventer 4

NEW DUQM OIL AND GAS PRIVATE TERMINAL FACILITY

Description:

NDIA Terminal Project

Project Information

Location: Duqhm Region, Oman

Category: Port Facilities, Buildings (Port Terminal & Admin Building), Infrastructures, Roads, Tunnel

Client: NDIA Steering Committee

Consultants: Overseas Emaar Incorporated

Commencement: March 2022

Completion: November 2026

Scope of Work

The scope of work consisted of the design and construction of foundations for Concourse C of the NDIA Terminal.

  • 2,769 Nos. Piles spread over an area of 72,000 m²
  • 190,000 m³ Concrete: Piles & Pile Caps
New Duqhm oil and gas terminal 1
New Duqhm oil and gas terminal 2
New Duqhm oil and gas terminal 3

Heavy machining

Description:

Al Ruwi Al Tasneem LLC offers a complete range of machining services from turning of simple components to complete machining of complex large structures.

Heavy machining capabilities include:

  • Turning: Up to 4 meters in diameter and 9 meters long
  • Horizontal Machining: Up to 2.5 meters long and 3.5 meters high
  • Gear Machining: Up to 1.7 meters in diameter
  • Cylindrical Grinding: Up to 8 meters long
  • Deep Hole Drilling and Honing: Up to 9 meters long
  • New Duqhm oil and gas terminal 3

    Effluent Treatment Facility Project

    Location - Sohar:
    • CLIENT - Oman National Petroleum Company
    • Construction Period - 2010-2015
    • Works Done by Al Ruwi Al Tasneem Includes : 4 Pre- Stressed concrete Structures, 17 Buildings, 57 Steel Tanks 2 Cooling Towers, 5 Chillers, 244 Pumps and 215 Various Mechanical Equipments 2 Substations with 11 KV incomers, 19 transformers, 11KV & 3.3 KV switchgears Fully Automated plan
    • Installation of 7 Air Assisted Flair Stacks : Acid Gas Recovery Plant
    • CLIENT : Al Ghanim
    • Construction Period - 2007-2010 (3 years)
    • Renovation and Revamp : 2024 -2026 ( Ongoing)
    • Design, Procurement, Supply, Installation, Construction, Inspection, Testing, Pre-commissioning, Commissioning and Hand-over of new Tank Vapour (TV) and High Pressure (HP) Air Assisted Smokeless flares along with all the piping. Installation of the new flares, while utilizing the existing system, to provide standby flares for smokeless operation.
    Air Assisted Flair Stacks
    Air Assisted Flair Stacks
    Air Assisted Flair Stacks
    Treatment Facility
    Treatment Facility
    Treatment Facility
    Treatment Facility